Haul-out and launching are the most critical moments of any refit or maintenance job. Good planning protects both the boat and the work done on it. A boat is hauled out for painting, osmosis treatment, fibreglass repair and underwater maintenance. The operation can damage the boat through wrong sling points, inadequate support or poor positioning. Before relaunching, antifouling timing, anodes, seawater intakes and fittings must be checked.
In short:
- Sling points are set according to the manufacturer's markings on the boat.
- On the hard the boat must sit on balanced and sufficient support; support points must suit the structure and weight.
- Areas left under the cradle pads are painted just before launching.
- The pre-launch checklist covers leaks, anodes, propeller and fittings.
What we check during haul-out and launching#
Tap a number or an area in the list.
Sling and support points#
A boat's weight is carried at specific reinforced points of the hull. If the slings are not placed on these points, the hull or fittings can be damaged. On the hard, the boat must share its weight across enough supports; they are positioned so that they do not harm the hull and keep the boat balanced.
- Forward sling point
- Aft sling point
- Stern support (cradle pad)
- Midship support
- Bow support
Before hauling out your boat#
Boat haul-out and launching step by step#
- Plan: slings, crane
- Haul out: with care
- Support: balance
- Maintenance: work items
- Check: anodes, seacocks
- Launch: leak test
The pre-launch checklist must be applied every single time.
- Planning
Date, weather, crew and equipment are set. The boat's dimensions and weight are verified.
- Haul-out
Slings are placed, the boat is lifted slowly and visually checked for damage and leaks.
- Support
The boat is set on its cradle, supports are positioned and balance is checked.
- Hull wash
The hull is washed and inspected. Moisture readings and damage assessment are carried out.
- Maintenance and repair
The planned paint, repair and underwater work is carried out.
- Pre-launch check
Antifouling, anodes, propeller and seacocks are checked; pad marks are painted.
- Launching
The boat is lowered slowly and checked for leaks and water ingress in the first minutes.
Cradle pad marks and antifouling timing#
- 1AntifoulingFinal coat; pad marks painted just before launch
- 2Barrier / tie coatAdhesion and protection between antifouling and substrate
- 3Substrate: cleaned hullWashed, inspected and dry surface
Areas under the pads stay unpainted and are finished just before launching. Number of coats and timings follow the product data sheet.
Areas under the cradle pads remain unpainted. They are painted once the boat has been moved onto different support points, or just before launching. The launch window between the final antifouling coat and immersion is planned according to the product data sheet and must not be missed. For more, see our guides on antifouling and old coating removal and barrier coat.
Boat launch checklist#
Common haul-out and launching mistakes#
- Placing slings on the manufacturer's marked points.
- Keeping the boat on sufficient, balanced support ashore.
- Timing the final antifouling coat to the launch window.
- Checking all seacocks and fittings before launch.
- Leaving anodes unpainted.
- Placing slings at the wrong points.
- Leaving the boat ashore on inadequate or unbalanced support.
- Missing the launch window and exceeding the antifouling's maximum time to immersion.
- Launching without checking the seacocks.
- Painting the anodes.
For the order and recording of work done ashore, see removal, refitting and work log; for propeller and anode care, see anode and propeller area maintenance.
Boat haul-out and launching FAQ#
Where do I find the sling points?
The manufacturer usually marks the sling points on the hull or in the owner's manual. If there is no information, a specialist determines them from the boat's weight distribution and structure.
How many days does a boat stay on the hard?
It depends on the work to be done, drying time and weather. Refit and painting jobs can take anywhere from days to months.
Do cradle pads spoil the antifouling?
Areas under the pads stay unpainted. They are painted after the boat is moved onto different support points, or before launching.
What is checked before launching?
Anodes, propeller, seawater intakes, a dry bilge and hull leaks; all seacocks and fittings are checked to be closed or in the correct position.
Does the weather affect launching?
Yes. Wind and waves make line and sling handling harder. Launching is planned for a safe weather window.
What determines the cost of haul-out and launching work?
Boat length and weight, time spent ashore, and the scope of paint, repair and underwater work determine the cost. A firm figure is given in writing, item by item, after the survey.
When should a boat be hauled out?
A boat is hauled out when work such as painting, osmosis treatment, fibreglass repair or underwater maintenance is planned. We agree the right timing with you at the survey, based on the work, drying needs and weather.