Before coating work such as paint and varnish, hardware is removed and after completion it is refitted. If this is not run in an orderly way, parts get lost, screws get mixed up and refitting is delayed. On top of that, getting the different trades (joinery, painting, sealing, electrical and mechanical) into the right order and recording what has been done is the foundation of refit quality. Orderly removal, labelling and a work log prevent these problems.
In short:
- Every part is photographed, labelled and grouped as it is removed.
- Hardware is removed before paint and varnish; masking is used only for parts that cannot be removed.
- Sealing is renewed at refitting; old bolts and gaskets are checked.
- A photo work log and handover file is valuable for maintenance and resale.
Hardware removal and labelling parts#
Tap a number or an area in the list.
Before removal, each area is photographed and connections and cable runs are recorded. Parts are grouped by area, bolts and screws go into separate bags and each bag is marked with the area name. Bolts that look the same can differ in length and type, so they are never mixed.
Sequencing and coordinating refit work#
| Stage | Who does it? | Coordination note |
|---|---|---|
| Removal | Joiner, painter | Labelling and photos |
| Structure and laminate | Fibreglass technician | Dusty, dirty work ends here |
| Electrical and mechanical | Specialist | Cable and pipe runs planned before painting |
| Joinery | Joiner | Parts are trial-fitted and surfaces prepared |
| Paint and varnish | Painter | Clean environment, curing time |
| Refitting and sealing | Joiner, technician | Sealing renewed, bolts tightened |
| Testing and relaunch | Whole team | Checklist |
The jobs are not independent of each other; skipping a stage or swapping its place disrupts the others. For the general order, see our refit guide.
Refitting hardware step by step#
- Photograph: remove
- Label: group
- Prepare: surface
- Refit: sealed
- Tighten: progressively
- Test: water and function
An unlabelled part is the biggest time-waster in a refit.
- Parts check
Removed parts are counted against labels and photos; missing or damaged parts are identified.
- Surface and sealing preparation
The mounting surface is cleaned and old product residue is removed.
- Hardware installation
Hardware is fitted with suitable sealant and new bolts or gaskets.
- Tightening and adjustment
Bolts are tightened progressively and evenly; moving parts are adjusted.
- Function test
Hatches, locks, winches and hardware are operated.
- Watertightness test
Windows and hardware surroundings are checked with a hose test.
- 1HardwareNew bolts or gaskets, tightened progressively and evenly
- 2SealingRenewed at refitting
- 3Mounting surfaceCleaned, old product residue removed
- 4Base: deck or hullSurface with paint and varnish work completed
Sealant and application conditions are chosen according to the product data sheet.
For under-hardware and window sealing, see our Sikaflex applications guide.
Work log and handover file#
Common mistakes in removal and refitting#
- Photographing and labelling during removal
- Bagging bolts and screws separately by area
- Renewing gaskets and sealing at refitting
- Putting the jobs in the right order
- Keeping a work log
- Getting changes approved in writing
- Removing parts without photos and labels
- Mixing up bolts and screws
- Refitting without renewing old gaskets and sealing
- Not putting the jobs in the right order
- Not keeping a work log
- Leaving changes as verbal agreements
Removal, refitting and work log FAQ#
Why does hardware need to be removed?
Paint and varnish around hardware never finish properly, even with masking. Removal gives a cleaner result and is also an opportunity to renew the under-hardware sealing.
How are removed parts stored?
Each group is kept in a labelled bag or box, with the area it came from written down and a photo attached. Small compartment boxes are used for small parts.
How are electrical and mechanical jobs coordinated?
Other trades are slotted into the work order; cable and pipe runs are planned before joinery and painting, while refitting is left until last.
What does the work log include?
Photos, measurements, products used (with batch numbers), application conditions and change approvals.
Why is the handover file important?
It serves as evidence and a guide for maintenance planning, warranty, insurance and resale.
What determines the price of removal and refitting work?
The quantity and type of hardware to be removed, access, the number of points where sealing is renewed and the scope of testing. A firm price is given in writing, item by item, after the survey.
How long do removal and refitting take?
It depends on the amount of hardware, the curing times of the paint and varnish work in between, and the test results. An estimated schedule is confirmed in writing after the survey.