Alexseal Metallic Base Coat (M Series) is the metallic base coat of a two-stage system used together with Topcoat 501 Clear (T0125).
Mixing, thinning, film thickness, drying times and application conditions are summarised from the manufacturer data sheet.
What is Alexseal Metallic Base Coat (M Series) for and where is it used?#
- Yacht interior and exterior areas not under permanent immersion
- The clear coat is required to seal and protect the base coat
Surface preparation#
- The substrate must be clean, dry and free of dust, grease and oil.
- Final sand of Finish Primer 442: dry 280–320 or wet 500–600 grit.
- Between clear coats use dry 320–400 or wet 500–600.
Mixing and thinning#
Base and hardener are mixed at 5 : 1 : 3 by volume; the hardener is added while stirring and mixed thoroughly.
Thinner: Reducer R5070 (fast) or R5050 (medium), ratio 50 % (by volume).
Pot life: Base coat 12 h (15 °C), 10 h (20 °C), 8 h (25 °C), 6 h (30 °C); clear 6/6/4/4 h.
Application method and film thickness#
- Application methods: Air spray.
- Wet film per coat: 25–50 µm / cross coat
- Dry film per coat: 20–40 µm (2 cross coats); clear 50–75 µm
- Number of coats: Base coat minimum 2 medium cross coats (max. 3); clear 2–3 coats on first application
- Theoretical coverage: 10.5 m²/l (base, 25 µm); 6 m²/l (clear, 75 µm)
- Volume solids: Base coat 25–40 % (depending on colour)
- Equipment: Gravity gun 1.2–1.4 mm; pressure pot 1.0–1.2 mm; atomizing 3.0–5.0 bar (optimal 4 bar); cross-coat technique
- Base converter C5051; clear: T0125 + C5051 1:1, reducer 15–25 % (R5070, R5050 or R5030), accelerator A5035 only in the clear (max. 10 ml per 2 L).
- The base coat must be overcoated with clear within the window (6 h in tropical conditions); remove masking tape overcoated with clear within about 2 h.
Drying and recoat times (20 °C)#
- Dust free: 1 h
- Tape dry: 30 h
- Minimum recoat interval: 30 min
- Full cure: 18 days
Times by temperature
- Base coat recoat (tack-up): 15 °C — 45 min · 20 °C — 30 min · 25 °C — 30 min · 30 °C — 30 min
- Clear dust free: 15 °C — 90 min · 20 °C — 60 min · 25 °C — 45 min · 30 °C — 30 min
- Clear tape dry (no accelerator): 15 °C — 36 h · 20 °C — 30 h · 25 °C — 24 h · 30 °C — 18 h
Drying times increase with film thickness; make sure the film is fully dry before recoating.
Application conditions#
- Minimum temperature: Ambient and object at least 15 °C (ideal 25 °C); surface at least 3 °C above the dew point
- Maximum temperature: 30 °C
- Maximum relative humidity: 40–80 %
- Do not apply in rain, fog, condensation or direct sun; make sure the surface is dry.
Compatible products and system#
- Preceding coats: ALEXSEAL Finish Primer 442
Common mistakes#
- Painting without cleaning and abrading the surface
- Using the wrong thinner type or ratio
- Not abrading between coats
- Applying in damp, foggy or direct-sun conditions
Health and safety#
The product is flammable; keep it away from sparks and open flames and do not smoke in the work area. Ventilate, and avoid skin contact and inhaling spray mist. In case of eye contact, rinse with plenty of water and seek medical advice. Do not pour waste into drains.
Frequently asked questions#
How many coats of Alexseal Metallic Base Coat (M Series) are applied?
Value stated in the data sheet: Base coat minimum 2 medium cross coats (max. 3); clear 2–3 coats on first application.
How is Alexseal Metallic Base Coat (M Series) thinned?
Value stated in the data sheet: Reducer R5070 (fast) or R5050 (medium): 50 %.
_Source: Mankiewicz Coatings ALEXSEAL technical data sheet (TDS M series / T0125, Rev 04/2018). The values on this page are compiled from the manufacturer’s published documents and may change as the product develops. Before application, always check the product label, the current technical data sheet (TDS) and the safety data sheet (SDS)._