AlexsealFiller and fairing

Alexseal Fairing Compound 202: how is it applied?

Alexseal Fairing Compound 202 is a solvent-free, epoxy-based, lightweight fairing filler. Mixing, thinning, film thickness, drying times and application conditions according to the manufacturer data sheet.

  • 4 min read
  • Updated:

Alexseal Fairing Compound 202 is a solvent-free, epoxy-based, lightweight fairing filler.

Mixing, thinning, film thickness, drying times and application conditions are summarised from the manufacturer data sheet.

Alexseal Fairing Compound 202: technical summary and drying times
Key values for Alexseal Fairing Compound 202 (manufacturer data sheet)

What is Alexseal Fairing Compound 202 for and where is it used?#

  • Fairing on GRP and metal (above and below the waterline)
  • In cold conditions (below 15 °C) with the fast converter

Surface preparation#

  • The substrate must be clean, dry and free of dust, grease and oil.
  • Grind or blast to P36–P60 before priming; a less aggressive profile for thin fairing under 3 mm.
  • Sand primers (except 161) with P60–P80 after overnight drying on GRP.

Mixing and thinning#

Base and hardener are mixed at 1 : 1 (volume) or 10 : 6 (weight) by volume; the hardener is added while stirring and mixed thoroughly.

Pot life: Standard/LV: 1 h (15 °C), 50 min (20 °C), 40 min (25 °C), 30 min (30 °C); fast: 45/35/25/15 min.

Application method and film thickness#

  • Application methods: Trowel / spatula.
  • Volume solids: 100 %
  • Apply with trowel or spatula; mix with slow-turning dough mixers or by hand, never with a drill. Block sand P36–P120, finish with P80 or finer; scratch-sand between layers with P36–P60.

Drying and recoat times (20 °C)#

  • Dry to sand (20 °C): 24 h
  • Full cure: 7 days

Times by temperature

  • Dry to sand: 15 °C — 36 h · 20 °C — 24 h · 25 °C — 18 h · 30 °C — 12 h
  • Dry to sand – fast converter: 15 °C — 12 h · 20 °C — 8 h · 25 °C — 6 h · 30 °C — 4 h
  • Full cure: 15 °C — 8 days · 20 °C — 7 days · 25 °C — 6 days · 30 °C — 5 days

Drying times increase with film thickness; make sure the film is fully dry before recoating.

Application conditions#

  • Minimum temperature: Optimal 15–30 °C; do not use below 10 °C or above 40 °C
  • Maximum relative humidity: 40–80 %
  • Do not apply in rain, fog, condensation or direct sun; make sure the surface is dry.

Compatible products and system#

  • Preceding coats: Metal: Protective Primer 161 (over 161 unsanded for up to 6 months)
  • Preceding coats: GRP: Super Build 302, Finish Primer 442 or Protective Primer 161
  • Subsequent coats: 302, 303, 328 and 442 (after minimum dry time and block sanding)
  • Subsequent coats: If used below the waterline, seal with Finish Primer 442.

Common mistakes#

  • Mixing with a drill and trapping air
  • Mixing by eye instead of by scale or measure
  • Applying mixed material that is past its pot life
  • Applying to unprimed surfaces or without scratch-sanding the primer
  • Leaving coarse sanding scratches that print through the topcoat

Health and safety#

The product is flammable; keep it away from sparks and open flames and do not smoke in the work area. Ventilate, and avoid skin contact and inhaling spray mist. In case of eye contact, rinse with plenty of water and seek medical advice. Do not pour waste into drains.

_Source: Mankiewicz Coatings ALEXSEAL technical data sheet (TDS 154-20, Rev 2023). The values on this page are compiled from the manufacturer’s published documents and may change as the product develops. Before application, always check the product label, the current technical data sheet (TDS) and the safety data sheet (SDS)._

On-site survey

Right product, right application

We inspect your boat on site and recommend the suitable system in writing.