Alexseal Protective Primer 161 is a two-component, epoxy-based protective primer with corrosion inhibitors.
Mixing, thinning, film thickness, drying times and application conditions are summarised from the manufacturer data sheet.
What is Alexseal Protective Primer 161 for and where is it used?#
- Corrosion protection on steel and aluminium (above and below the waterline)
- Adhesion promoter on all substrates; tie coat before fairing over gelcoat and raw resin lay-up
Surface preparation#
- The substrate must be clean, dry and free of dust, grease and oil.
- Steel: blast to SA 2.5 (SSPC-SP10), Sa 3 preferred, or grind P36–P40; profile 50–100 µm.
- Aluminium: blast or grind (36–60 grit) to bright clean metal; profile 50–100 µm.
- Gelcoat P80–P100; fibreglass P36–P60 and/or blast. Ideally apply within 6 hours of preparation.
Mixing and thinning#
Base and hardener are mixed at 6 : 1 by volume; the hardener is added while stirring and mixed thoroughly.
Thinner: Reducer R4042, ratio 5–10 % (by volume).
Pot life: 8 h (15–20 °C), 6 h (25 °C), 4 h (30 °C).
Application method and film thickness#
- Application methods: Air spray, Airless spray, Brush, Roller.
- Wet film per coat: 200–300 µm
- Dry film per coat: 90–135 µm (spray section); 80–100 µm (coverage table)
- Number of coats: One cross coat or two coats
- Theoretical coverage: 4.8 m²/l (theoretical); 2.4 m²/l (spray), 3.5 m²/l (brush/roller)
- Volume solids: 48 %
- Equipment: Gravity gun 1.8–2.5 mm; airless tip 0.35–0.43 mm / 60°, 2–3 bar; atomizing 2.0–4.0 bar
- Converter C1617. Fairing can be applied over 161 unsanded for up to 6 months.
Drying and recoat times (20 °C)#
- Dust free: 30 min
- Tape dry: 24 h
- Minimum recoat interval: 4 h
- Full cure: 9 days
Times by temperature
- Dust free: 15 °C — 40 min · 20 °C — 30 min · 25 °C — 20 min · 30 °C — 10 min
- Tape dry: 15 °C — 30 h · 20 °C — 24 h · 25 °C — 20 h · 30 °C — 16 h
- Full cure: 15 °C — 11 days · 20 °C — 9 days · 25 °C — 7 days · 30 °C — 5 days
- Recoat with 161 (min.): 15 °C — 6 h · 20 °C — 4 h · 25 °C — 2 h · 30 °C — 2 h
- Overcoat (min.): 15 °C — 32 h · 20 °C — 16 h · 25 °C — 16 h · 30 °C — 12 h
Drying times increase with film thickness; make sure the film is fully dry before recoating.
Application conditions#
- Minimum temperature: Ambient and object at least 15 °C (ideal 25 °C); surface at least 3 °C above the dew point
- Maximum temperature: 30 °C
- Maximum relative humidity: 40–80 %
- Do not apply in rain, fog, condensation or direct sun; make sure the surface is dry.
Compatible products and system#
- Subsequent coats: 202, 212, 302, 303, 328, 442, 414, 501 (maximum 6 months; sanding needed after that)
Common mistakes#
- Applying without degreasing and abrading the surface
- Changing the mix ratio
- Missing the recoat window and painting without abrading
- Applying in damp or cold conditions
Health and safety#
The product is flammable; keep it away from sparks and open flames and do not smoke in the work area. Ventilate, and avoid skin contact and inhaling spray mist. In case of eye contact, rinse with plenty of water and seek medical advice. Do not pour waste into drains.
Frequently asked questions#
How many coats of Alexseal Protective Primer 161 are applied?
Value stated in the data sheet: One cross coat or two coats.
How is Alexseal Protective Primer 161 thinned?
Value stated in the data sheet: Reducer R4042: 5–10 %.
_Source: Mankiewicz Coatings ALEXSEAL technical data sheet (TDS 153-60, Rev 2023). The values on this page are compiled from the manufacturer’s published documents and may change as the product develops. Before application, always check the product label, the current technical data sheet (TDS) and the safety data sheet (SDS)._