Alexseal Super Build 302 is an epoxy-based high-build primer and surfacer. Mixing, thinning, film thickness, drying times and application conditions according to the manufacturer data sheet.

  • 4 min read
  • Updated:

Alexseal Super Build 302 is an epoxy-based high-build primer and surfacer.

Mixing, thinning, film thickness, drying times and application conditions are summarised from the manufacturer data sheet.

Alexseal Super Build 302: technical summary and drying times
Key values for Alexseal Super Build 302 (manufacturer data sheet)

What is Alexseal Super Build 302 for and where is it used?#

  • Isolating surfacer over fillers (e.g. Fairing Compound 202), gelcoat and raw resin lay-up
  • Surface levelling before the final primer

Surface preparation#

  • The substrate must be clean, dry and free of dust, grease and oil.
  • Fillers P60–P150; gelcoat P80–P150; fibreglass resin P36–P60 and/or blast (dull, no shiny spots); old coatings P100–P150.
  • After sanding fillers, clean and dust off thoroughly.

Mixing and thinning#

Base and hardener are mixed at 1 : 1 by volume; the hardener is added while stirring and mixed thoroughly.

Thinner: Reducer R3040, ratio 10–25 % (airless 12.5; conventional 25) (by volume).

Pot life: About 12 h; about 6 h with A4030 (15–30 °C).

Application method and film thickness#

  • Application methods: Air spray, Airless spray, Brush, Roller.
  • Wet film per coat: 150–300 µm / coat
  • Dry film per coat: 150–300 µm (2 coats); max. 500 µm
  • Number of coats: 2–3 coats; minimum 150 µm dry film before sanding
  • Theoretical coverage: 2 m²/l (theoretical, 500 µm); 1.2 m²/l (conventional), 2.0 m²/l (airless)
  • Volume solids: 60 %
  • Equipment: Gravity gun 2.0 mm; airless tip 0.43 mm / 60°, 3–5 bar
  • Converter C3052; accelerator A4030 (max. 1 pint per gallon of base). If the overcoat time is exceeded, sanding is required.

Drying and recoat times (20 °C)#

  • Tape dry: 24 h
  • Minimum recoat interval: 2 h
  • Maximum recoat interval: 24 h
  • Full cure: 18 days

Times by temperature

  • Tape dry: 15 °C — 30 h · 20 °C — 24 h · 25 °C — 18 h · 30 °C — 12 h
  • Full cure: 15 °C — 21 days · 20 °C — 18 days · 25 °C — 14 days · 30 °C — 10 days
  • Recoat with same product (min.): 15 °C — 4 h · 20 °C — 2 h · 25 °C — 1 h · 30 °C — 1 h
  • Overcoat with other products (min.): 15 °C — 12 h · 20 °C — 12 h · 25 °C — 12 h · 30 °C — 12 h

Drying times increase with film thickness; make sure the film is fully dry before recoating.

Application conditions#

  • Minimum temperature: Ambient and object at least 15 °C (ideal 25 °C); surface at least 3 °C above the dew point
  • Maximum temperature: 30 °C
  • Maximum relative humidity: 40–80 %
  • Do not apply in rain, fog, condensation or direct sun; make sure the surface is dry.

Compatible products and system#

  • Subsequent coats: Seal with ALEXSEAL Finish Primer 442 before topcoating

Common mistakes#

  • Applying without degreasing and abrading the surface
  • Changing the mix ratio
  • Missing the recoat window and painting without abrading
  • Applying in damp or cold conditions

Health and safety#

The product is flammable; keep it away from sparks and open flames and do not smoke in the work area. Ventilate, and avoid skin contact and inhaling spray mist. In case of eye contact, rinse with plenty of water and seek medical advice. Do not pour waste into drains.

Frequently asked questions#

How many coats of Alexseal Super Build 302 are applied?

Value stated in the data sheet: 2–3 coats; minimum 150 µm dry film before sanding.

How is Alexseal Super Build 302 thinned?

Value stated in the data sheet: Reducer R3040: 10–25 % (airless 12.5; conventional 25).

_Source: Mankiewicz Coatings ALEXSEAL technical data sheet (TDS 153-14, Rev 2023). The values on this page are compiled from the manufacturer’s published documents and may change as the product develops. Before application, always check the product label, the current technical data sheet (TDS) and the safety data sheet (SDS)._