Boat refit services are not a fixed package. One vessel may need hull and coating renewal, while another prioritises teak, furniture, glazing or underwater protection. At Göcek Setur Marina, projects up to 40 metres are scoped around survey findings rather than a standard list.
Services that may form part of a refit#
Work is sequenced around dependencies: removal and structural repairs, joinery and surface preparation, paint or varnish, followed by sealing and refitting. Underwater work is aligned with the launch window. The written scope identifies what the vessel needs instead of adding every possible service.
- Hull, fibreglass, gelcoat and osmosis assessment
- Paint, teak, joinery and exterior finishing
- Glazing, seams, hardware and pre-launch underwater work
Tap a number or an area in the list.
Putting work items in the right order#
Rework often begins when dependent tasks are sequenced backwards. Removal and structural repair precede sanding, timber trial fitting and paint. Glazing and hardware are not refitted before coatings cure. Underwater coating is matched to product instructions and the launch date. An itemised work list states who closes each stage and what check confirms completion.
From service list to project plan#
Scope depends on vessel length, intended use and season schedule. Read the yacht refit process or request a survey to define the work items suitable for your vessel.
Frequently asked question#
Do all boat refit services need to be done at once?
No. Safety, structure and watertightness take priority; cosmetic and optional work can be assigned to later phases. The sequence should avoid creating rework.
