Perfection Undercoat: how is the 2K polyurethane undercoat applied?

Two-pack polyurethane undercoat: 3:1 volume, 10 minutes wait, 38 µm dry film per coat and 2 hours pot life at 23 °C.

  • 4 min read
  • Updated:

Perfection Undercoat is a two-pack polyurethane undercoat. It prepares the surface for the topcoat and forms a film.

Perfection Undercoat is used as an undercoat in PU systems. Pot life varies with temperature and is detailed in the technical data sheet.

Perfection Undercoat position in the system
Topcoat times according to the technical data sheet.

What does Perfection Undercoat do and where does it sit in the paint system?#

Perfection Undercoat forms a film in the undercoat that supports adhesion of the topcoat.

Which surfaces and where is it used?#

  • Undercoat under PU topcoat
  • Application by brush and roller
  • Undercoat in surface preparation

Surface preparation: the stage that decides the outcome#

Surface must be clean, dry and grease-free. Not applied above 80% relative humidity.

Pre-application checklist0/4

Mix ratio, induction and pot life#

Base and hardener (YGA006) are mixed at 3 : 1 by volume. After mixing, wait 10 minutes.

Thinner No.9 is used for thinning; the ratio is not specified in the technical data sheet.

Perfection Undercoat mixing
Wait 10 min after mixing.
Perfection Undercoat pot life
TemperaturePot life
5 °C5 h
15 °C3 h
23 °C2 h
35 °C1 h

Application: step by step#

Applied by brush or roller in 1–2 coats. A dry film of 38 µm and a wet film of 76 µm per coat are targeted. Generally no spray.

Perfection Undercoat application
Brush or roller.
  1. Mix

    3 : 1 by volume.

  2. Wait

    10 minutes.

  3. Thin

    Thinner No.9.

  4. Apply

    Brush or roller.

  5. Between coats

    Min 10 h, max 2 days (23 °C).

Perfection Undercoat coat values
ParameterValue
Number of coats1–2
Dry film / coat38 µm
Wet film / coat76 µm

Drying and recoat times#

Perfection Undercoat is touch-dry in 3 hours at 23 °C and sandable in 16 hours. A recoat window of min 10 h and max 2 days is expected.

Perfection Undercoat drying times
Stage (23 °C)Time
Touch dry3 h
Sanding16 h
Recoat (min)10 h
Recoat (max)2 days

Application conditions: temperature, humidity and dew point#

Product, ambient and surface applied at 5–35 °C. Not applied above 80% relative humidity.

Perfection Undercoat application conditions
Temperature limits.

Tips from the professionals#

  • Let the mix stand for 10 minutes.
  • Apply within the pot life.
  • Follow the recoat window.
  • Do not apply when humidity is high.

Common mistakes#

Correct practice
  • 3 : 1 volume mix
  • 10-minute wait
  • Thinner No.9
  • Humidity control
Common mistake
  • Application over single-pack paint
  • Relative humidity above 80%
  • Application outside pot life
  • Spray application

Health and safety#

Frequently asked questions#

What is the Perfection Undercoat mix ratio?

3 : 1 by volume.

How many coats of Perfection Undercoat?

1–2 coats.

Which thinner is used with Perfection Undercoat?

Thinner No.9.

Perfection Undercoat recoat?

Min 10 h, max 2 days (23 °C).

_Source: International Yacht Paint (AkzoNobel) product technical data sheet (TDS) and product page (Perfection Undercoat data sheet). The values on this page are compiled from the manufacturer's published documents and may change as the product develops. Before application, always check the product label, the current technical data sheet (TDS) and the safety data sheet (SDS)._

On-site survey

Right product, right application

We inspect your boat on site and recommend the suitable system in writing.