Yacht refit guides

Catamaran Refit Services: Planning for Two Hulls

Catamaran refit planning assesses both hulls, bridge deck, connecting areas, access and haul-out capacity separately.

  • On-site survey
  • Written quotation
  • Documented handover
  • 2 min read
  • Updated:

A catamaran refit must account for different access and working conditions across two hulls and the bridge deck. Repair on one side can affect shared structure or access to the other, so measurements and sequencing should reflect the vessel’s design.

Areas reviewed during a catamaran refit#

Each hull, the bridge deck, connecting areas, waterline, deck finish and fittings are assessed. Marina capacity for haul-out and support points must be confirmed. Repairs, paint, teak and sealing are planned by hull and brought together at shared checkpoints.

  • Condition and finish checks on both hulls and bridge deck
  • Confirmed haul-out, support and work-area access
  • Coordination of paint, laminate, teak and underwater work
Refit work areas on the vesselThe diagram highlights approximate areas that may be assessed during a refit. The work scope is confirmed for the individual vessel after measurement and on-site inspection. The diagram shows a monohull; both catamaran hulls and the bridge deck need separate assessment.
Side view diagram of a yacht; the areas covered by this service are marked with numbers. Waterline 1 2 3

Tap a number or an area in the list.

Measurements and access across twin hulls#

Do not assume both catamaran hulls are in the same condition; record each side and the bridge deck with separate photos and measurements. Support points, working height and access to exterior surfaces must be checked against the haul-out method. Repair and coating sequence considers symmetry and shared connections. The diagram is a monohull reference, not a drawing of catamaran geometry.

Confirm dimensions and site suitability first#

Projects up to 40 m are considered at Göcek Setur Marina; catamaran beam, weight and lifting method require separate confirmation. Share vessel dimensions and known damage during a refit survey.

Frequently asked question#

How is a catamaran refit different from a monohull refit?

Twin hulls, bridge deck, beam and support points affect access and haul-out planning. The work area must suit the vessel, with separate checks for each hull.

Related searches

People looking for this service also search for

All of the topics below are covered by this service and delivered by the same team under one plan.

  • catamaran refit services
  • catamaran yacht refit
  • catamaran hull repair
  • catamaran painting
  • twin hull refit

On-site survey

Let us inspect your yacht together

We assess the condition on site and provide a written plan and quotation with scope, timing and price.