A catamaran refit must account for different access and working conditions across two hulls and the bridge deck. Repair on one side can affect shared structure or access to the other, so measurements and sequencing should reflect the vessel’s design.
Areas reviewed during a catamaran refit#
Each hull, the bridge deck, connecting areas, waterline, deck finish and fittings are assessed. Marina capacity for haul-out and support points must be confirmed. Repairs, paint, teak and sealing are planned by hull and brought together at shared checkpoints.
- Condition and finish checks on both hulls and bridge deck
- Confirmed haul-out, support and work-area access
- Coordination of paint, laminate, teak and underwater work
Tap a number or an area in the list.
Measurements and access across twin hulls#
Do not assume both catamaran hulls are in the same condition; record each side and the bridge deck with separate photos and measurements. Support points, working height and access to exterior surfaces must be checked against the haul-out method. Repair and coating sequence considers symmetry and shared connections. The diagram is a monohull reference, not a drawing of catamaran geometry.
Confirm dimensions and site suitability first#
Projects up to 40 m are considered at Göcek Setur Marina; catamaran beam, weight and lifting method require separate confirmation. Share vessel dimensions and known damage during a refit survey.
Frequently asked question#
How is a catamaran refit different from a monohull refit?
Twin hulls, bridge deck, beam and support points affect access and haul-out planning. The work area must suit the vessel, with separate checks for each hull.
