For owners planning yacht refit in Turkey, location is only one part of the decision; marina access, haul-out, logistics and the season schedule matter too. DR. YACHT manages survey-led refit projects for vessels up to 40 metres at Göcek Setur Marina.
Planning a refit in Göcek#
Confirm when the vessel can arrive, which work needs to be done ashore and when it must return to the water. Marina rules, hangar availability, material supply and local weather conditions belong in the schedule. A firm completion date or facility commitment should not be made until these items are confirmed.
- On-site survey at Göcek Setur Marina
- Project length up to 40 m, with site suitability assessed separately
- Two covered hangars subject to marina availability and rental terms
Tap a number or an area in the list.
From arrival in Göcek to return to water#
For a Turkey refit, the vessel’s arrival date, marina acceptance, haul-out and work-area availability need to be confirmed on one calendar. Lead time for imported equipment or specialist materials is planned separately. Sharing the route, scope and target handover early helps prioritise the work list. Customs and marina services should not be assumed to be included in a contractor quotation.
Coordinating boat refit in Turkey#
DR. YACHT aligns work sequence with the owner’s route and operating plans. Review the refit planning stages before confirming marina and logistics arrangements.
Frequently asked question#
How do I start a yacht refit project in Turkey?
Share the vessel’s length, current location, target dates and known issues to arrange a survey. Findings, priorities and marina conditions can then be translated into a written scope and schedule.
