Planning Refit Projects: Scope, Priority and Schedule

A refit is a comprehensive project that renews a vessel systems and fittings. Planning makes the project predictable and traceable.

  • 2 min read
  • Updated:
  • Level: Orta

Short answer

A refit plan consists of assessing the current condition, ranking priorities, a written scope, a schedule and a budget. Allowance for unexpected findings should be kept in the schedule and budget.

Key points

  • The refit scope should be defined in writing.
  • Priorities should begin with safety and the hull.
  • The schedule should account for unexpected findings.

1. Introduction#

Refit and restoration projects often require many interdependent tasks to be carried out together. Because of these links, changes in scope as a project progresses are a common problem. This study proposes a planning approach to keep scope and schedule under control.

2. Planning Flow#

Figure 1 shows the planning flow in five stages. Each stage uses the written output of the previous one as its input. In this way the reasons for decisions remain traceable throughout the project.

Refit planning flow
Figure 1. Refit planning flow: 1 condition assessment, 2 priority list, 3 written scope, 4 schedule, 5 budget and control points.

3. Schedule Structure#

Figure 2 represents, schematically, the relative durations of the work packages of a refit schedule. The bars show only relative durations; actual numbers of days are set after inspection according to the condition of the vessel.

Work packages of a refit schedule
Figure 2. Refit schedule: 1 hull inspection, 2 surface work, 3 systems work, 4 fittings, 5 testing and handover. The bars schematically show relative durations.

4. Discussion#

The most common risk in refit projects is starting cosmetic work before the hull has been inspected. A problem discovered in the hull may invalidate part of the work already completed. For this reason, the order of priority should begin with hull and safety work.

5. Conclusion#

  • The refit scope should be defined in writing.
  • Priorities should begin with safety and hull work.
  • Unexpected findings should be allowed for in the schedule and budget.