Paint and Coatings

Painting Plan After Haul-Out: Managing Time Ashore

Haul-out gives access to the whole hull, a rare opportunity. Using this opportunity well depends on the correct sequencing of the work.

  • 2 min read
  • Updated:
  • Level: Orta

Short answer

Painting after haul-out follows an ordered plan: hull cleaning, inspection, repairs, primer and coat application, and a final check. Repairs must be completed before painting.

Key points

  • Time ashore gives access to the whole hull.
  • Inspection and repairs must be completed before painting.
  • Drying times should be included in the schedule.

1. Introduction#

Hauling a vessel out gives access to the whole hull, including the underwater section. This access means that inspection, repair and painting work that cannot be carried out in the water can be done in a single window. This study explains how that window should be planned.

2. Sequencing of Work#

Figure 1 shows the sequence of work after haul-out in five stages. The sequence rests on a chain logic in which the output of one task is the input of the next.

Sequence of work after haul-out
Figure 1. Sequence of work after haul-out: 1 cleaning, 2 inspection, 3 repairs and drying, 4 surface preparation and primer, 5 coat application and final inspection.

3. Drying and Waiting Periods#

Figure 2 shows, schematically, the components of the time spent ashore. The bars express only relative magnitudes. Drying periods are the least predictable component of repair and painting work, so it is advisable to allow a separate margin for them in the schedule.

Components of time spent ashore
Figure 2. Components of time ashore: 1 cleaning, 2 inspection, 3 repair and drying, 4 painting. The bars schematically show relative magnitudes.

4. Discussion#

The most common inefficiency in haul-out work is starting to paint without completing the inspection. In this case, a problem found later in the hull requires part of the painting to be redone and extends the time ashore. For this reason the inspection must be completed before painting begins.

5. Conclusion#

  • Time ashore is an opportunity that gives access to the whole hull.
  • Inspection and repairs must be completed before painting.
  • Drying times should be included in the schedule.

Was this guide helpful?

Guide content is for general information; in practice, the current technical data sheet of the product applies.